City launches adaptive bike path project in southeast Calgary

The lane was launched on 18 St. S.E. to address concerns about traffic and safety in the community. Until September 12, 18 Street will be reduced to a single lane in each direction between Quarry Park Blvd. and Rivervalley Dr. S.E. The lane was launched on 18 St. S.E. to address concerns about traffic and safety in the community. Until September 12, 18 Street will be reduced to a single lane in each direction between Quarry Park Blvd. and Rivervalley Dr. S.E.

CTVNews.ca Top Stories