Contractors want to repurpose Milk River high school rather than see it demolished
The bell at Erle Rivers High School in Milk River, Alta., will ring for the last time on June 26, as the 114-year-old school is scheduled to be torn down to make way for a new K-12 school.
But a group of contractors hopes to preserve the building and convert it into a multi-use centre, including adding 23 one- and two-bedroom units, expanding a church and adding community spaces.
"Much of this well-maintained building is pre-cast concrete and designed to last for generations," said Jarrad McCoy, a Milk River-based contractor.
"It has a fresh roof that should last another 40-plus years, handicap accessibility, high-quality doors and windows. ... This would be ideal for young families and professionals to call home."
In a town short of rental units, retired Milk River doctor Lisa Lewke-Bogle says the project would fill a number of gaps in the community.
"This project would be a godsend," she said.
"Everybody wants to sell and nobody wants to rent and people coming into the community aren't always ready to commit to purchasing property."
Both Lewke-Bogle and McCoy say more housing options would also help grow the town and attract outside investors.
In order to stay on track with its timeline and pre-existing contract, Horizon School Division, which operates Erle Rivers, says the building is set to be demolished.
The Alberta government is planning to build a $24.7-million K-12 school on a new piece of property in the town.
The demolition of the existing school has a price tag of $850,000.
In August, the group met with town council about the proposed plan.
The group says council was on board.
After the meeting, the group met with Horizon, who the group says ultimately decided on continuing with the demolition despite an investor's offer of $250,000 to save the school.
"The board has decided to proceed with demolition given the deteriorating condition of the building, the pre-existing signed contract between the board, Alberta Infrastructure and the general contractor, the need to adhere to pre-existing timelines and the significant costs and risk to the board regarding possible salvage at this point in time," a statement Horizon board chair Marie Logan said.
But supporters say they haven't been able to get a clear answer as to why the board won't consider the plan.
"When you're in a position of leadership, one of your key responsibilities is to listen," said Bob Bogle, a former MLA for Milk River.
"You need to sit down with the people you've been elected to represent and listen to them and you can't listen if you don't meet.
"All those potential investors and developers are asking for is an opportunity to sit down, meet and be heard."
Horizon went on to say the board intends to dispose of the bare land to the town following the demolition process, so the town can make decisions regarding future development.
Which McCoy says then has the potential to be turned into residential properties.
It's a step he's calling unnecessary.
"New construction of this quality of institution-grade building starts around $300 a square foot," he said.
"Even new residential construction is around $200 a square foot, if you're lucky. To retrofit some of these units would be half of that ... about $100 a square foot."
Alberta Education Minister Demetrios Nicolaides says the province takes the directions set by the school boards on how best to use schools.
"They are in the best position to decide how to manage their budget, save costs and operate their facilities," a statement from his office said.
The group hopes to meet with the town and school division again before the building is torn down.
CTVNews.ca Top Stories
House of Commons Speaker Greg Fergus survives vote calling for his ouster
Greg Fergus survived a vote to oust him as House of Commons Speaker on Tuesday, but with close to half of MPs expressing a loss of confidence in him, he faces a precarious path forward in maintaining order in Parliament.
'It was hell': Israeli mother held hostage with her children describes 51 days in captivity
Hagar Brodutch, her three children and four-year-old neighbour were kidnapped by Hamas-led militants from their home in Kfar Aza, Israel on Oct. 7 and held for 51 days. They were released in November, but Brodutch says her thoughts are never far from those still being held in Gaza.
'Unruly passenger' forces WestJet flight to make emergency landing in B.C.
A WestJet flight heading to Calgary had to make an emergency landing in northern B.C. Monday due to an incident involving an 'unruly passenger,' Mounties say.
P.E.I. kiteboarder 'lucky to be alive' after shark attack in Turks and Caicos
A professional kiteboarder from P.E.I. says he has been seriously injured in a shark attack that occurred while he was snorkelling in the Turks and Caicos Islands last week.
Teen dies after being hit by train in N.W. Calgary
A teenager has died after being hit by a train in northwest Calgary on Tuesday afternoon.
Black bear kebabs make family sick with parasitic worms
It was supposed to be a celebration, but one family’s unique meal of black bear meat sent several members to the hospital instead.
'It's his vacation too': Jimmy the baby goat joins 2-week road trip across Canada
After Jimmy the baby goat was shunned by his mother, a New Brunswick man took the kid on a two-week road trip across Canada.
The double-level airplane seat is back. This time, there’s a first-class version
It’s the airplane seat design that launched a thousand memes and kickstarted a media storm. And now the double-level seat is back – only this time, with a twist.
New COVID-19 subvariants become the dominant strains in Canada
More than four years after COVID-19 effectively shut down the world, two new variants of COVID-19 have become the dominant strains of the novel coronavirus in Canada.